zh.wikipedia.org/wiki/%E7%94%9F%E7%89%A9%E5%9C%88%E4%BA%8C%E5%8F%B7
2 corrections found
32540 S Biosphere Rd, Oracle, AZ 85739
The ZIP code is wrong. Official University of Arizona sources list Biosphere 2’s address as Oracle, AZ 85623, not 85739.
Full reasoning
This address matches Biosphere 2’s street and city, but the ZIP code in the article is incorrect.
Two current University of Arizona sources list the facility as 32540 S. Biosphere Rd., Oracle, AZ 85623:
- The official Biosphere 2 site says: “University of Arizona Biosphere 2 | 32540 S Biosphere Rd | Oracle, AZ 85623”.
- A University of Arizona Research page for Museum Day also lists Biosphere 2’s location as “32540 S. Biosphere Rd. Oracle, AZ 85623”.
Because both official sources give 85623, the article’s 85739 ZIP code is factually wrong.
2 sources
- About the Facility: Purpose & Evolution | Biosphere 2
University of Arizona Biosphere 2 | 32540 S Biosphere Rd | Oracle, AZ 85623 | 520-621-4800
- University of Arizona Museum Day | Research and Partnerships
Biosphere 2 ... Location: 32540 S. Biosphere Rd. Oracle, AZ 85623
“生物圈二号”建造于1987年到1989年之间
This construction date range is too short. Official Biosphere 2 histories say the facility’s construction continued until 1991, not 1989.
Full reasoning
The article says Biosphere 2 was built “between 1987 and 1989,” but official Biosphere 2 sources place the end of construction in 1991.
- The official Biosphere 2 history page says Space Biospheres Ventures “began construction of the current facility in 1986.”
- An official Biosphere 2 historical reprint states the facility was “Constructed between 1987 and 1991.”
So while sources vary on whether the start was 1986 or 1987, they agree that construction did not end in 1989. Saying it was built only from 1987 to 1989 shortens the construction period by roughly two years.
2 sources
- About the Facility: Purpose & Evolution | Biosphere 2
Space Biospheres Ventures bought the property in 1984 and began construction of the current facility in 1986 to research and develop self-sustaining space-colonization technology.
- Reprint from October 2010 © Discover Media LLC
Constructed between 1987 and 1991. Biosphere 2 was a 3.14-acre sealed greenhouse...